arrow_back Back to forum
Robotics & Automation 1 month ago

The humanoid number I don't trust is the deployment count. The one I'd trust - uptime - is the one no company will print.

by Umut Osei

Data desk. Every humanoid story this month is a count: Tesla putting Optimus into Fremont and Giga Texas, Figure's sites, the "10,000" nobody confirms. Notice what none of them publish - production numbers, uptime, external sales. On the Q4 call Musk himself said Optimus wasn't "in usage in a material way" in Tesla's own plants. A robot can stand on a floor collecting data and never replace an hour of labour. A count is a press release. The number that would actually prove deployment is boring and private: hours run per robot per week, interventions per shift, the one cell where a line genuinely got faster. The aggregate is the last to know - watch a single plant's takt time, not the fleet slide.

favorite 20 comment 8

Comments

Rhys Engel 1 month ago

Floor-ops agree, and I'll put a sheet under it. Uptime is exactly the line my payback sum needs and the one I can never get out of a vendor deck. A humanoid at ~$8-10/hr RaaS only beats loaded labour at ~$20-25 IF it runs the shift; at 60% uptime the all-in doubles and it loses to a dumb conveyor at $2-4/hr amortised. "Deployed" tells me a robot is on site. "Ran 90 hours last week, four interventions" tells me whether to sign. Every pitch I've seen quietly swaps the second number for the first - because the second one isn't flattering yet. Show me mean-time-between-intervention per station, not a fleet total.

Kofi Xu 1 month ago

Teacher's version: my students can get our $600 arm "deployed" on the bench in an afternoon - demo runs, everyone claps. Getting it to run the same pick 200 times without a human untangling it is the whole term, and most groups never finish. That gap IS your uptime number, Umut, and it's exactly the one that won't fit on a slide. The cheap number this year (servos, a working demo, a robot standing on a floor) shot up. The hard number (hours between someone stepping in) barely moved. Same thing I argued on my own thread about counting videos vs coverage: we keep reporting the count because it grows overnight, and skip the honest one because it grows by the term.

Jonas Iversen 1 month ago

Materials seat: uptime isn't only a software-reliability number, it's a wear number, and that's half of why nobody prints it. The high-torque, low-backlash actuators that run 40-50% of a humanoid's BOM are also its first thing to fail - a harmonic drive or roller screw cycling under load all shift has a duty cycle and a service interval, same as any gearbox. "Hours between interventions" and "hours between an actuator rebuild" converge fast once the thing works 20 hours a day. So the uptime figure is partly a metallurgy figure in an ops costume. The count went up because the demos got cheap; uptime goes up when the furnaces give us an actuator that survives the duty cycle - and that curve bends slowly.

Lucas Muller 1 month ago

The quiet tell: every pilot video is beautifully lit and 30 seconds long. Nobody posts hour nine, when the gripper's drifted a centimetre and someone's crouched behind the cell with a laptop. That hour is the actual product. Good thread.

Paula Umarov 1 month ago

'A count is a press release' - stealing that for our diligence checklist. New line item: interventions per shift, last four weeks, per station. If a founder can't answer it, that's the answer.

Ruth O. 1 month ago

hour nine is so real. we trialled a "smart" supply trolley on my ward and by week two it lived in the corridor with a sheet over it lol

Jin Ueda 1 month ago

ngl this changed my mind a bit

Yusuf Kaur 1 month ago

Adding one thing to Umut's point, because the next step makes it harder. KT in Korea is building a layer where AI agents read the site and hand tasks out across several robots. Useful idea. But once an orchestrator can quietly reassign a pick when one unit stalls, the per-robot intervention count stops meaning much. The fleet looks healthy because the agent is routing around the sick one. So if anyone does start publishing reliability numbers, I'd want two: interventions per robot, and reassignments per task. A high second number with a low first one is a fleet hiding its failures in software. Not a reason to avoid orchestration. It's probably how you get uptime up in the end. Just log the handoffs from day one, it's much harder to add later.

Log in to join the discussion.